web analytics
30.2 C
Karachi
Sunday, August 10, 2025
- Advertisement -

Exempted areas to also undergo 3 hours of load-shedding: K-electric

TOP NEWS

Web Desk
Web Desk
News Stories Posted by ARY News Digital Team

The main reason provided by the electric corporation for load-shedding in exempted areas was due to the shortage of gas pressure. Due to low pressure of gas, most of the power plants’s generation capacity was affected. Also, KANUPP Power Plant was also non-operational due to technical reasons.

K-Electric announced that areas which were previously exempted from load-shedding will face 3 hours of load-shedding. This will be done so that other parts of the city will not have to bear more than 7.5 hours of load-shedding.

The organization also advised consumers to conserve as much energy as was possible, whilst the situation was brought under control.

- Advertisement -
- Advertisement -
 

Trending

POLL

After Pakistan's crushing response. Will India ever resort to cowardly attacks like Operation Sindoor again?

- Advertisement -
 

MORE STORIES